Aboveground Storage Tank (AST) Installation & Removal
TEC has decades of experience designing and installing aboveground storage tank systems. Our certified installers will professionally install your AST or a system of interconnected ASTs.
Whether your marina needs multiple ASTs for diesel and gasoline, or your motor pool needs 10,000 to 20,000 gallons of fuel storage for your fleet of trucks or buses, TEC can assist. Perhaps your small business needs only 500 gallons of heating oil for your facility, TEC can help with that as well.
If you are upgrading your existing fueling system, we can also remove and dispose of that system in conjunction with the installation of your new AST system.
Benefits of Choosing TEC for Your AST Installation
In-House Estimating
Our sales & estimating team communicates with you to design the fueling system that meets your demands. We then tailor a system to your specific site needs.
Equipment Pricing
Due to TEC’s affiliations and volume, we are very price-competitive with tanks and accessories.
Collaborative Project Managers
Each AST system installation, and site, is unique. Our PMs understand this and often provide valuable input that helps our clients create a better overall system.
How AST Installation Works
TEC follows a time-tested process for our AST installations, however, each site is unique, presenting various challenges and designs.
In the preliminary stage, we coordinate with the client on a schedule with an anticipated start date, followed by submittal data, permitting, and any notifications to local jurisdictions or environmental agencies.
Once the site utilities are marked and cleared, we mobilize to your site and stage equipment to initiate the work. If an existing AST is being replaced, the removal and site demolition occur next. In the installation phase, TEC delivers the tank and its accessories on-site and preps the area (concrete pads, grading, etc.).
Tank accessories often include:
- Spill and overfill protection
- Level probes
- Leak sensors
- Automatic tank gauging
Following installation, we conduct client training on the new system during start-up. We finalize your project with a walk-through to address punch list items you may have and provide any final installation documentation.
How to Set Up AST Installation or Removal with TEC
Step 1:
Reach out to us via phone, email, or our contact form to get the process started.
Step 2:
Our sales & estimating team will reach out to determine your precise needs and typically conduct an in-person site visit to understand your site-specific demands.
Step 3:
Our team will provide you with a comprehensive quote to review, including a plan that outlines all the work to be completed.
Step 4:
Most jurisdictions require permitting for an AST installation project by either the local fire marshal or building inspector, but not necessarily for an AST removal. TEC can easily determine when a permit is necessary. Work can commence once all parties have agreed on the scope of work, pricing, and terms & conditions.
What Our Clients Say
“TEC is always there when we need them; very responsive and has saved our company thousands of dollars from delayed closings.”
S. Mitchell, Developer, Alexandria, VA
“TEC performed an Outstanding job getting it done!”
Department of Labor, Kelly Generator
Trust Total Environmental Concepts with Your AST Installation or Removal Needs
Partnering with TEC provides you with access to a wealth of expertise, specialists, and tailored solutions. We value our client relationships and specialize in AST system installation, closure, and removal.